Hangat
Dikemaskini pada 1 Apr 2026
News Stack ini lebih baik dalam aplikasi
Imbas kod KR dengan telefon anda untuk beralih ke aplikasi
Baca semua artikel tanpa had pada aplikasi Lumi News
Muat turun secara percuma
β What Happened
Large tree branches fell onto the tracks near Taman Paramount Station, halting rail operations. Rapid KL technical teams cleared the debris within 2 hours to ensure the safe resumption of services.
- Generated by AI
π Frequency Adjustments
Alternative shuttle train services have been terminated. However, commuters should expect slightly longer waiting times as Rapid KL works to regulate the frequency and schedule of the train sets.
- Generated by AI
β Restoration Of Service
Clearing works for the tree branches obstructing the tracks near Taman Paramount Station were completed at 9:35 on 1 April 2026. Normal through-services have officially resumed across the entire line.
- Generated by AI
π People Also Ask
1. Which stations are affected?
The disruption specifically impacts the stretch between Kelana Jaya and Asia Jaya stations on the line.
2. Is the waiting time back to normal?
Not yet; waiting times are slightly longer as the system undergoes frequency adjustments to return to the peak-hour schedule.
3. What caused the tree to fall?
Preliminary reports suggest heavy rain and strong winds last night weakened the soil around the tracks.
- Generated by AI
Apakah
News Stack?
News Stack ialah kompilasi artikel dan video teratas mengenai topik paling hangat, dipilih oleh pasukan editorial Lumi merentas 80+ media. Lihat tajuk berita terbesar tentang topik itu, semuanya dalam satu suapan yang mudah dan boleh dikongsi.
Tiada komen
Tinggalkan komen pertama di sini!
Muat turun aplikasi untuk sertai!
Lebih News Stack
Tiada komen
Tinggalkan komen pertama di sini!
Muat turun aplikasi untuk sertai!